It is now day #23 without a kitchen!
The floor tile that was holding things up last week finally arrived and our contractor installed it Wednesday and Thursday.
He spent Friday morning getting ready for the counter top delivery scheduled for Friday afternoon. It arrived at 3:45 in the afternoon!
It left about 4:30 in the afternoon!
They had promised us a one seam installation. There were two seams and no explanation as to why. The one seam was in the wrong place, over the dishwasher, which is not allowed. We had ordered a 12"-14" lazy Susan to be made out of the sink cut out. They brought me a 10 inch square cutting board!
The contractor and I were both furious. They have to make us a new counter top. Who knows how long it will take!? In the interim, he has to find work and I have to deal with the lack of a kitchen.
My contractor goes on vacation in two weeks. If the counter top isn't installed and the job finished before he leaves, I have to wait until mid-August to get my kitchen back.
He helped me hook up the stove and move some stuff around to make the place livable in the interim.
At the same time, Comcast came to fix a connection in the attic, Serve Pro was there installing new insulation in the attic and the roofers were working on the chimney.
My grandson couldn't find a quiet place to take a nap and was very stressed out by all the commotion and noise. I was stressed feeling bad for him and all that was going on and going wrong.
Around 6:00 S.O. called to tell me her aunt had fallen down a flight of stairs and was on her way to the hospital. She passed away around midnight.
I've had enough.