Hi just come back from my trip and guess what i had a flood in one of my bedrooms but luckily the ceiling only needs plastering .
The kitchen will commence on thursday when the work tops go in and i hoping for the kitchen to be totally finished with in 2 weeks.
Will keep you posted.
I tried alot of nice food on my trip and shall divulge the dishes if this thread is of any interest.
I know i have been going on about my kitchen all summer this week will be the 7th week of work inbetween a 4 week holiday so ou have to endure 12 weeks of me moaning basically.
Thank you
The kitchen will commence on thursday when the work tops go in and i hoping for the kitchen to be totally finished with in 2 weeks.
Will keep you posted.
I tried alot of nice food on my trip and shall divulge the dishes if this thread is of any interest.
I know i have been going on about my kitchen all summer this week will be the 7th week of work inbetween a 4 week holiday so ou have to endure 12 weeks of me moaning basically.
Thank you