roadfix
Chef Extraordinaire
As part of my on-going patio project I began construction of an all concrete BBQ counter and area. After the counter cures it will be polished and sealed.
More area ground slabs will be poured, along with a RR tie retaining wall at the far end of the 9' long counter to hold all the dirt back. That area will be excavated about 5' past the end of the counter, slabbed also, and RR tie wall erected to enclose that area.
I have an old charcoal bbq grill insert for the counter. The rest of my smokers and grills will nest in the nook at the far right end of the counter.
I'll post more photos as this project takes shape...
More area ground slabs will be poured, along with a RR tie retaining wall at the far end of the 9' long counter to hold all the dirt back. That area will be excavated about 5' past the end of the counter, slabbed also, and RR tie wall erected to enclose that area.
I have an old charcoal bbq grill insert for the counter. The rest of my smokers and grills will nest in the nook at the far right end of the counter.
I'll post more photos as this project takes shape...