The exterior rigid insulation has been installed, most windows are in, the exterior doors installed, work is progressing on the fireplace installation and the 8 foot ceiling above the pantry, bathroom and laundry room. There has also been some drywall hung but that is a fluke. Coming up soon is the blown in cellulose insulation and a bunch of digging around the house. I will have gutters and 6 downspouts with catch basins draining into a 1200 gallon underground storage tank.
Photos are of the inside of the front door.